Texas deck on the West Atlas.

Blog Image

30″ Connector on the cantilever.

Blog Image

Shoe joint @ the floor.

Blog Image

Shoe joint on the floor.

Blog Image

Blog Image

Blog Image

Blog Image

Blog Image

Blog Image

30″Connector landed and cemented.

Blog Image

Blog Image

Overshot installed, ready too dril 26″ hole

Blog Image

Blog Image

Finished running 20″ casing. N/down overshot. Cold Cut 30″ Connector and installed Adj. Landing ring.

Blog Image

Blog Image

Blog Image

B.O.P installed, ready to dril 17 1/2″ hole.

Blog Image

Blog Image

Blog Image

Blog Image

Blog Image

Blog Image